Team
We have defined collaboration
as our watchword
We have a clear and agreed method. Following it means quickly achieving the expected results, without nasty surprises.
Time is a determining factor, in life as in work, so we don’t want to waste it. With KanbanBOX we bring time back to the centre of attention, focused on the present, but with an eye to the future.
Because all the time saved is useful time for planning the future, identifying new challenges and pursuing increasingly stimulating objectives, for you as well as for us.
Join KanbanBOX
Join our talented team
Case studies
BCS | Agricultural Mechanization
BCS moved from push to pull through E-kanban for suppliers, production, and internal flows. They now manage 6000 kanban loops across 3 plants and integrated KanbanBOX with SAP
El.Co. | Industrial Electrical Automation
El.Co. has simplified the maintenance of kanbans with e-kanban, which was previously so onerous that the number of parts managed by kanban had to be limited
Orotig | Welding Industry
Orotig has implemented sequential pull in the company, optimizing multi-process production scheduling and supplier integration with KanbanBOX
Rossi SpA | Gearmotors and Electric Motors
Rossi Spa has digitalized the existing production and move kanban, and then integrated it with its own ERP, with the Oracle Sequencer and with the suppliers
Aptiv | High-tech automotive systems
From the introduction of kanban to the transition to e-kanban. The Lean Improvement journey of the largest manufacturer of electronic interconnection systems for the automotive sector
References
Some of our clients